Assembly Instructions (For A Partially Completed Machine); Working On The Electric Fittings - Meiko UPster K Operating Instructions Manual

Rack type dishwashing machine
Hide thumbs Also See for UPster K:
Table of Contents

Advertisement

Operating instructions for rack type dishwashing machine , model Upster K
Risk of injury due to electric shock
Work or repairs to the electrical equipment of the system must be conducted by a
qualified electrician!
The wiring diagram for the partially completed machine delivered contains all nec-
essary operational shut-offs known to the manufacturer MEIKO, as well as other
known, necessary shut-offs and electrical connections. Connections have been il-
lustrated on the wiring diagram. Always make sure that these connections are im-
plemented prior to commissioning the machine, and that they work reliably.
If any unknown sources of danger that are not described by MEIKO arise due to
connecting system parts, you must eliminate them; this may potentially mean that
you must not operate the machine.
9726766
6
Assembly instructions (for a partially completed
machine)
These apply where the MEIKO product is a partially completed machine in the
sense of the Machinery Directive (Directive 2006/42/EC).
Observe the following items when connecting MEIKO products to an existing instal-
lation:
- The components must be aligned with one another, connected in an appropri-
ate manner, and fastened so that safe operation is assured. (Choose conditions
and fasteners on site in line with this).
- Dangers (e.g. drawing in, crushing, shearing or cutting) that potentially arise
due to the connection must be prevented appropriately.
- The electrical connection to the supply grid on site, and any necessary electri-
cal connections must be implemented in line with the enclosed wiring diagram.
- During installation, make sure that you avoid damage, in particular to the elec-
trical installation.
- After completing the works, check the system for damage.
- Safety and function checks must be performed at the latest within the scope of
overall system testing prior to commissioning/machine handover.
6.1

Working on the electric fittings

Design and construction subject to change without prior notice!
Page 16 of 42
DANGER

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents