Items To Be Prepared By Customer - Mitsubishi Electric CR800 Series Instruction Manual

Multifunctional electric hand option
Hide thumbs Also See for CR800 Series:
Table of Contents

Advertisement

3Check Before Use

3.2 Items to be Prepared by Customer

Table 3-4:Customer-prepared items
No.
1
Robot arm
2
Cable fixation plate
3
Cable tie
4
Cable tie mount
5
Control unit stand
6
Installation flange for electric
hand
Note1) In "●" indicates the load (4kg: "04", 7kg: "07", 13kg: "13", 20kg: "20") of the robot arm.
Note2) In "*" indicates the load (3kg: "3", 6kg: "6", 12kg: "12", 20kg: "20") of the robot arm.
Note3) When using ESC11-B-11XW133-5-M control unit.
Note4) When using ESC11-B-12XW111-5-M control unit. (RIO Wiring goes out, the specification.)
3-16 Items to be Prepared by Customer
Item
RV-2F series
RV-2FR series
1
As required
As required
1
RV-●F series
RV-●FR series
Note1)
1
1
-
Note3)
As required
-
Note3)
1
Note4)
1
1
Quantity
RH-*FH series
RH-*FRH series
Note2)
1
-
As required
-
-
1
RH-3FHR
RH-3FRHR
1
-
As required
-
-
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr750 seriesCr751-dCr751-qCr800Cr751 series

Table of Contents