Connection 1 Llh + 1 Direct Zone + Mixing Zone + Dhw Zone - DeDietrich AMC 15 Installation And Service Manual

Wall-hung gas condensing boilers
Table of Contents

Advertisement

6 Installation
Fig.56
1 boiler + 1 LLH + 1 direct zone + mixing zone + DHW zone
1
B
A
X12
N
X13
B
N L
N
8
5
A Boiler
B Low loss header
C Direct zone - CircA1
54
AMC
C
X9
X10
SCB-10
X1
X8
C
N L TS
N L
6
X15
A
N L
TS
N L TS
N
4
2
Caution
If the tank is fitted with a Titan Active System® corrosion
protection anode, connect the anode to the inlet (+ TA on the
anode, - on the tank).
If the tank is not fitted with a corrosion protection anode, put the
simulation connector in place (delivered with the DHW sensor
(accessory))
6.7.8
Connection 1 LLH + 1 direct zone + mixing zone + DHW
zone
D
3
2
4
5
L-BUS
X2
X11
SP
RS
S-BUS
X14
Status
C
B
0-10V
+
-
T out
4
3
2
1
R-Bus
R-Bus
1
X14
1
2
C
B
Tsyst Tsyst Tdhw Tflow Tflow Tflow
7
9
3
D Mixing zone - CircB1
E DHW zone -DHW1 (layered calorifier - 2 sensors)
6
8
X3
X5
X4
A
A
R-Bus
X131
CB-03
X03
A
TA
+TA-
R-Bus
BL
RL
7686707 - v.01 - 06092018
E
7
9
AD-3001073-01
X136
Tout
Tdhw
AD-3001084-02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Amc 25/28 miAmc 25Amc 35

Table of Contents