Package Content - Lanner NCA-5710 User Manual

Network appliance platform
Table of Contents

Advertisement

NCA-5710 User Manual
1. Check the package contents of the Slide Rail Kit. The kit shall include the following items:
1x pack of M4X4L screws (for securing the sliding rail on the system)
2 x Slide Rails
The rail consists of the following parts:
Release Tab
Rail Lock
Rail Bracket
Attaching the Rail Brackets
2. Unpack a slide rail and slide the
Inner Channel all the way to the
end.
3. Stretch the Rail Bracket to the
fullest.
4. Remove the Rail Bracket from the
Inner Channel by pushing the
Release Tab on the Rail Bracket
outwards while sliding it out.
Inner Channel
39
Outer Channel
Release Tab

Advertisement

Table of Contents
loading

Table of Contents