Transport And Storage; Assembly - ProMinent DULCOTEST CGE 2-mA-10 ppm Operating Instructions Manual

Chlorine measuring cell for organic bound chlorine
Table of Contents

Advertisement

Available languages

Available languages

Transport and storage / Assembly
4
Contents
• CGE measuring cell complete with diaphragm cap.
• Bottle containing electrolyte (50 ml)
• Nozzle for bottle
• Membrane cap, spare membrane cap
• Operating instructions
• Small screwdriver
Storage
• Storage period for the probe including the
• Storage period for the electrolyte in
• Storage and transport temperature
• Humidity
5
24

Transport and storage

NOTE
The probe should be transported only in its original
packaging.
Keep the packaging, including the polystyrene, and use it to
return the probe if repair becomes necessary.
membrane in the original packaging
the original bottle (order no. 792892)

Assembly

CAUTION
Wear safety goggles and protective clothing when handling
water or solutions that contain chlorine.
IMPORTANT
• Do not touch or damage the membrane or electrodes.
• The electrolyte is susceptible to oxidation: always keep
the electrolyte bottle sealed after use. Do not put the
electrolyte into other transparent containers.
• The electrolyte should not be stored for more than 1 year
and should not be yellow (see the label for the date of
manufacture).
• Avoid air bubbles when pouring the electrolyte.
• The membrane cap must be used only once.
1 year
max. 1 year
+5 to +50 °C
max. 90 % rel. humidity,
non-condensing
ProMinent
®

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dulcotest cge 2-ma-2 ppmDulcotest cge 2-4p-10 ppm

Table of Contents