Hi‐T
Centralized controller 
2.2 CLOCK 
It's present a clock with backup battery. 
2.3 CONNECTIONS 
Open the control applying a slight pressure in the lower and upper parts of the control, in order to separate the rear cover from the 
front one. Pass the cables through the hole in the rear panel and make connections according to the following guidelines. 
Terminals 1 and 2: 12 V ac power connect supply (terminal on chiller 12V‐ e 12V+). 
Terminals 3‐4‐5: connect the RS‐485 bus: terminal 3 to terminal GNDR, terminal 4 to R‐ and terminal 5 to R+.  
 
2.1 INSTALLING 
The Hi‐T  control is used for fixing to the wall according to the standard 503.  
In the rear part of the control some pre‐drilled holes are present to be detached pursuing a pressure with a screwdriver, in such a 
way as to obtain the holes useful to the fixing. Of the 6 holes, use only the outer 2 holes of the horizontal series (see Figure 3). 
Before  you  do  this,  open  the  control  itself,  applying  a  slight  pressure  in  the  lower  and  upper  parts  of  the  control,  in  order  to 
separate the rear cover from the front one. 
Use the rear panel and apply the holes in the two slots shown in the figure below.  
Do not directly use the panel as a template to drill the holes on the wall, the electronics may be damaged during this operation. 
1
2
3
4
5
12
11
Figure 2. Connections. 
Figure 3. Holes for wall mounting. 
 
6
7
8
10
9
 
6

Advertisement

Table of Contents
loading

Table of Contents