Hi‐T
Centralized controller
8.4
DIP SWITCHES SETTING
Modify the Dip Switches inside the DRA‐L NET control as per:
•
Installed unit;
•
Water unit installation position;
•
Operation logic.
Dip Switches functions:
Dip Switch no.
Dip Switch no.
NOTES:
(1) on demand in heating, continuous in cooling.
(2) no Hot Start and Too Cool.
To enter the DIP Switches, follow this procedure:
•
First, separate the connectors' base plate from the main interface by means of a small screwdriver – insert the screwdriver
into the special holes (onto the container's side) and slightly twist until the two parts are divided;
•
By turning the back of the main interface, it is possible to see the Dip Switches fitted onto the printed circuit board.
8.5 WATER PROBE
• Install the probe downstream the valve and insulate it by means of aluminium tape;
•
As for the 4‐pipe systems, it has always to be fitted onto the hot water circuit, and never onto the cold water one;
•
Use only the probe supplied as accessory – NTC temperature probe, reinforced insulation, PVC cable, cable length = 1,5 m.
Note: Set the no.3 Dip Switch on the ON position –valve thermal regulation.
ON
OFF
x
1
x
x
2
x
x
3
x
OFF OFF
OFF
ON
4 ‐ 5
ON
OFF
ON
ON
System
Electrical resistances
Heating
Cooling
Electrical resistances
Description
Floor unit
Ceiling unit
On demand ventilation (1)
Continuous ventilation (2)
Valve thermal regulation
Fan thermal regulation
Description
2‐pipe and no resistance unit
4‐pipe unit
2‐pipe with setting resistances unit
2‐pipe with integration resistances unit
Dip Switches setting
Dip4 OFF
Dip4 ON
DIP5 OFF
DIP5 ON
2‐pipe
2‐pipe
NO
Integration
OUT 1
OUT 1
OUT 1
OUT 1
NO
OUT 2
Dip4 ON
Dip4 OFF
Dip5 OFF
Dip5 ON
2‐pipe
4‐pipe
Setting
NO
‐
OUT 2
OUT 1
OUT 1
OUT 2
NO
46