3.3
Initial filling and pressure test
•
Make sure that there are no external materials or soiling in the grease separator.
•
Check the system for airtightness, transport and installation damage and check the pipe connections.
•
Fill the complete grease separator system with water (up to system overflow on the outlet<35>).
•
Carry out pressure test, to do this
• Open both inspection covers.
• Seal outlet and inlet using suitable means.
• Fill the grease separator system completely
pipe stopper).
• Make the inlet and outlet functional again.
The system is now ready to use.
3.4
Instructional briefing / handover
Initial operation and instructional briefing are generally carried out by factory customer service employees.
•
The following points must be fulfilled for the putting into service and instructional briefing:
• Sanitary installations must be completed
• System filled with water and ready for operation
• The disposal company must attend the handover.
•
The following persons should be present at the handover:
• Person authorised to perform the acceptance on behalf of the building owner
• Sanitary fitter
•
In addition, we recommend the participation of
• Operating personnel
• Disposal company
• System operator
•
instructional briefing:
• Information about disposal
• Practical demonstration of the operating possibilities
• Functional test
• Information on disposal intervals
•
Handover of installation and operating instructions
•
After the instructional briefing has been completed, the grease separator must be made ready for operation
again, i.e. the system must be completely filled with cold water.
•
Drawing up the handover certificate. Make sure that there are no external materials or soiling in the grease
separator.
1) Fill up to 2 cm below the inspection opening.
010-916_SON_EN
Installation
with water and make sure there are no leaks (e.g. inflatable
1
12 / 18
2018/01