6.
Cleaning
6.1.
Flow areas
The passages of the valve are cleaned by the cleaning liquid during
cleaning of the connected pipelines.
The compatibility of the individually selected cleaning processes
and liquids with the respective seal material must be verified.
7.
Installation
7.1.
General terms
Installation must be undertaken in such a way that liquids can drain
off the valve housing and should preferably be carried out in vertical
position.
Attention!
Conductive connection to the pipeline must be provided.
The integration into the operational potential equalization must be
guaranteed!
Observe Welding Instructions 7.2.
UK
Modulating Valve
DELTA RG4-ATEX
Instruction Manual: UK-0