Installation instructions:
• Tighten the union nuts finger-tight.
• Mark the union nuts at the 6 o' clock position.
• Hold the screw connection body tight and tighten the
union nuts with 1 ¼ turns to the 9 'o clock position.
Assembly with high pressure applications and applications with a high security factor:
• Tighten the union nuts until the pipe can no longer be turned by hand or can no
longer be moved axially in the fitting.
• Mark the union nuts at the 6 o' clock position.
• Hold the screw connection body tight and tighten the union nuts with 1 ¼ turns to
the 9 'o clock position.
Re-mounting:
• Slide measurement sensor with clamping rings into the fitting as far as it will go.
• Tighten the nut "fingertight", then tighten by approx. a ¼ turn using a spanner.
3.5.2 Mounting with mounting flange (optional)
The assembly flange must not be used as Zone or Division bushing, i.e. it must only be used
for fastenings and bushings in explosion-hazard areas of the same category.
The measurement sensor must be mounted horizontally or vertically (downwards). If possible,
a drip tray should be placed into position before every installation.
Horizontal mounting
Vertical mounting
17