8 Verifying the Installation

1. Check whether the installation kit is securely installed and whether all screws are tightly secured.
2. Check whether all cables are reliably connected with correct polarity and no short circuit.
3. Check whether there are any empty screw holes. If there are, install screws in the empty holes.
4. Check whether the waterproof rubber bungs are properly inserted into idle cable outlets.

9 Power-On Check

Power on the switch and check indicators on the switch.
If the built-in power supply indicator PWR is steady green, the power module is supplying power.
If the system status indicator SYS blinks green slowly, the system is operating properly.
Check service configurations of the switch, for example, whether the switch is reachable and can be queried on
the NMS.
NOTE
For details about different states of the indicators, see the S5700 Hardware Description.
S5720I-10X-PWH-SI-AC is used as an example.
10 Closing the Maintenance Compartment Door
WARNING
After the maintenance compartment door is closed, tighten the captive screws on the door. Waterproof rubber bungs must be inserted
into the idle cable outlets to prevent water intrusion.
Procedure
Close the maintenance compartment door, and tighten the captive screws.
Step 1
(Optional) Install a cable cover (part number: 98010812), which needs to be separately purchased.