ProMinent DULCOTEST PAA 1-mA-200 ppm Operating Instructions Manual page 31

Measuring cell for peracetic acid
Table of Contents

Advertisement

Available languages

Available languages

Construction of the
measuring cells
Measurement station When set-up of the measurement station is complete, a two-wire
ProMinent
®
Fig. 1
Cable entry
M12 threaded
connector
Upper section
2-wire connection
Terminal block
Electrode shaft
O-ring seal
Rubber seal
Diaphragm cap
signal cable electrically connects the DULCOMETER
ing and control system for peracetic acid, connected to the power
supply, to the DULCOTEST
The measuring cell is installed either in the in-line probe housing
DLG III or in the modular construction of the in-line probe housing
DGM. A sample extraction valve (see section 15 ordering information)
can be screwed into the lower section of the DGM module (see
section 8.2 calibration).
The in-line probe housing is hydraulically connected to the sample
water current.
Construction and function
O-ring seal
Counter and reference
electrode
Collector
®
PAA measuring cell.
®
D1C measur-
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dulcotest paa 1-ma-2000 ppm

Table of Contents