Before you insert tubing into the
control mode. With reference to Figure 60 below, follow these steps to properly load
tubing into the
UPPER
SPRING-LOADED
CLIP
PUMP HEAD
LOWER
SPRING-LOADED
CLIP
1. Open the
PUMP
2. Select the desired tubing size (see Table 9 in Section 13.3 for reference) and cut a
length sufficient to reach from the inlet source, through the pump, and to the outlet
recipient, allowing a few extra inches.
3. Form a loop large enough to go around the pump head.
4. Pull the right side of the spring-loaded lever down to release the tubing guide.
5. Hold the upper spring-loaded clip open and load the upper clip channel; allow the
upper clip to close over the tubing.
New Brunswick Scientific
Figure 42: Standard Pump Array
PUMP CHANNEL
:
PUMP HEAD
Figure 60: Loading Pump Tubing
cover to gain access to the interior of the pump.
, verify that the
PUMP
TUBING GUIDE
SPRING-LOADED
LEVER
99
is in the
OFF
User's Guide