Figure 3-25 Connection Of Digital Interface For Mmg (Ics) - NEC NEAX 2400 ICS Manual

Digital remote unit system
Hide thumbs Also See for NEAX 2400 ICS:
Table of Contents

Advertisement

MAXIMUM 200 meters (656 feet)
LT
"LT" Connector Cable
(25P)
LT
MAXIMUM 100 meters
(328 feet)
LT3 (PIMA0/B0)
"LT3" Connector Cable
(25P)
PLO LEADS
DIU1B
DIU1A
DIU2B
DIU2A
DIU3B
DIU3A
DIU4B
DIU4A
Note:
If dual PLO are provided, the 34 PH PLO CA and installation cable of CPMA1 is also cross con-
nected with the DLI card of the clock distribution route.
CHAPTER 3
Page 100
Revision CD 1.0
MDF
PCM CABLE (2P)
PCM CABLE (2P)
Note
To "POUTA&B leads of the DLI card in the 1st clock distribution route.
To "POUTA&B leads of the DLI card in the 2nd clock distribution route.
To "POUTA&B leads of the DLI card in the 3rd clock distribution route.
To "POUTA&B leads of the DLI card in the 4th clock distribution route.

Figure 3-25 Connection of Digital Interface for MMG (ICS)

PCM Carrier
Equipment
PCM Carrier
Equipment
DLI LEADS
E
E
RB
RA
POUTB
POUTA
TB
TA
ND-45383 (E)
To DRU-23-S3
To PCM Carrier
Equipment
To "DIU x A&B" leads
of PLO card
(to be connected only
for sync. clock
distribution route).

Advertisement

Table of Contents
loading

Table of Contents