PRE-WIRE - 24V RS485
1. Run 5 conductor wires to the left side of screen
cassette installation location (refer to pg. 11). To be
sure you have the correct wire you can order SDN
wire directly from SI. If you are using third party wire,
follow the power wire distance chart (refer to pg. 7)
to ensure use of the correct wire gauge for the 24
VDC wires.
2. Terminate the wires with the provided terminal
blocks shown below.
Pre-Wire - 24v RS485
+ 24 VDC
V+
- 24 VDC
V-
Data +
+
Data -
-
Data ground
G
POWER WIRE DISTANCE CHART
Distance
over 100
Do not use any combination above the line.
6
Power Wire Distance Chart
Standard Cu Wire Guage (min.)
(ft.)
12
14
16
18
100
90
80
70
60
50
45
40
35
30
25
20
15
10
5
20
22
24
7