Test 5: Power Meter Reference Level; Power Meter Reference Level: Method 1; Figure 1-8 E4418B Power Meter Zeroing And Calibration Test - Keysight Technologies 53147A Service Manual

Microwave frequency counter, power meter, dvm
Table of Contents

Advertisement

1
Performance Tests - Verifying Specifications

Test 5: Power Meter Reference Level

Two methods for verifying the level of the Power Meter reference signal are
provided in this section. Both methods provide acceptable results, and either one
can be used.

Power Meter Reference Level: Method 1

Equipment Required
Keysight E4418B Power Meter
Keysight 8481A Power Sensor
Keysight 11730A Power Sensor Cable (supplied with 53147A/48A/49A)
– To ensure that the test results are valid, the Keysight 53147A/48A/49A and
NOTE
– The calibration of the Keysight E4418B Power Meter must be no more than
– This test is appropriate for the Keysight 53147A, 53148A, and 53149A.
1 Connect the Keysight 11730A Power Sensor Cable to the Keysight 8481A
44
the test equipment should be powered on for at least 30 minutes prior to
beginning the tests. This allows the internal temperatures of the equipment
to stabilize.
one level removed from NIST (National Institute of Standards and
Technology). If the E4418B Power Meter's calibration is more than one level
removed from NIST, the test results will be invalid.
Power Sensor (see
Figure
Figure 1-8
E4418B Power Meter Zeroing and Calibration Test Setup
Keysight 53147A/148A/149A Assembly Level Service Guide
1-8).

Advertisement

Table of Contents
loading

This manual is also suitable for:

53149a53148a

Table of Contents