Guidelines For Installation - Danfoss Link CC Installation Manual

Central controller
Hide thumbs Also See for Link CC:
Table of Contents

Advertisement

Installation Guide
3 .

Guidelines for installation

The signal strength is sufficient for most applications, however, wireless signals
are weakened on the way from the Danfoss Link™ CC to the room devices and
each building has different obstacles.
Ensure the best performance by keeping the following in mind for planning and
installation:
• Max. 30 m between devices in free space.
• Receiving devices should be placed on opposite or next wall as the transmitter,
if possible.
• All metallic parts in the building construction can weaken wireless signals.
• Reinforced concrete walls and floors weaken the signal strength significantly,
but almost all types of construction materials reduce the signal to some
degree.
• Corners, which is a result of the design of the building, can weaken the wireless
signals, due to either a longer distance or missing reflecting opportunities.
Note!
To get a good overview of the devices in each rooms, and their placement, Danfoss
recommends that an installation plan is made before beginning the actual installation.
Danfoss Heating Solutions
Danfoss Link™ CC
VISGL90N
GB
GB
12/2014
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents