Starting Up The Installation Menu; Mounting Mains Powered Devices - Danfoss Link CC Installation Manual

Central controller
Hide thumbs Also See for Link CC:
Table of Contents

Advertisement

Installation Guide

4 .3 . Starting up the installation menu

• Remove the front cover of the Danfoss Link™ CC by gently
pulling it off, pull near the edges of the cover.
• Press the SETUP pin for 3 seconds to enter the service
area.

4 .4 . Mounting mains powered devices

Power-up all mains powered
devices first, and any repeater units
that might be needed.
Note! If Danfoss Link™ HC is used, connect all actuators (TWA), before mains power-
ing the unit.ON/OFF relays are only visible in the end-user menu.
• Pair devices to Danfoss Link™ CC.
• Start with the device closest to the Danfoss Link™ CC,
and move outwards.
Danfoss Heating Solutions
Danfoss Link™ CC
VISGL90N
GB
12/2014
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents