Toro 34215 Operator's Manual page 28

Stand-on spreader/sprayer, serial no. 400000000 and up
Hide thumbs Also See for 34215:
Table of Contents

Advertisement

Figure 28
1. Locking sleeve
2. Gate cable
3. Ball stud
2.
Pull the cable off the ball stud
3.
Rotate the drop-rate cam past position-9 so
that the slot in the cam aligns with the linkage
(Figure
28).
4.
Fully push the rate-gate linkage rearward
28).
5.
If there is material in the hopper allow the
material to pour into a shallow pan; when the
hopper is empty, remove the pan.
g027304
4. Drop-rate cam
5. Rate-gate linkage
(Figure
28).
(Figure
Connecting the Rate-Gate Linkage
1.
Pull the linkage out until it clears the drop-rate
cam
(Figure
28).
2.
Move the wide-distribution impeller-gate lever
forward.
3.
Attaching the cable to the ball stud at the gate
lever(Figure
28).
Assembling the Impeller
1.
Assemble impeller onto the impeller shaft and
secure the impeller with the drive pin.
2.
Align the holes in the front cover with the clip
nuts in the chassis and secure the cover with
the 4 thumbscrews that you removed in step
of
Removing the Impeller (page
28
3
26).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents