Sprayer Controls - Toro 34215 Operator's Manual

Stand-on spreader/sprayer, serial no. 400000000 and up
Hide thumbs Also See for 34215:
Table of Contents

Advertisement

Rotate the narrow-spreader distribution-flow-rate
knob clockwise to decrease the discharge rate of
granular material from the hopper.
Rotate the distribution flow-rate-knob
counterclockwise to increase the discharge rate of
granular material from the hopper.
Impeller On/Off Switch
The impeller On/Off switch is located below the
impeller-distribution flow-rate knob at the bottom of
the control console
(Figure
Use the impeller On/Off switch to run the electric
motor that drives the impeller.
Press the impeller On/Off switch up to run the
impeller.
Press the impeller On/Off switch down to stop the
impeller.
Impeller-speed Control
The impeller-speed control is located to the right of
the impeller On/Off switch at the bottom of the control
console
(Figure
10).
Use the impeller-speed control to adjust the rotational
speed of the impeller.
Rotate the impeller-speed control counterclockwise
to decrease the rotational speed of the impeller.
Rotate the impeller-speed control clockwise to
increase the impeller speed.
Drop-rate Cam and Linkage
The drop-rate cam and linkage are located at the front
of the machine and below the hopper on the spreader
(Figure
11).
1. Slot–maximum position
Use the drop-rate cam to set the maximum amount of
material to be dispensed through the impeller gate
and onto the impeller.
10).
Figure 11
2. Linkage
The slot in the cam, after setting 9 on the cam, allows
the impeller gate to be opened to the maximum
position. This setting can be used for dry sand, ice
melt, or other materials that are difficult to spread.
Note:
Use cam setting 9 may when you are cleaning
out the hopper.

Sprayer Controls

1. Sprayer-pressure control
2. Tank-agitation lever
3. Narrow-spray pattern lever 7. Sprayer-pump switch
4. Wide-spray pattern lever
Sprayer Pressure Control
The sprayer-pressure control is located on the control
console
(Figure
Rotate the sprayer-pressure control clockwise to
increase the pressure to the sprayer nozzles
Rotate the pressure-control counterclockwise to
the decrease nozzle pressure.
Tank Agitation Lever
The tank-agitation lever is located on the control
console
(Figure
Setting the tank-agitation lever to the O
g027033
allows the sprayer pump to circulate the content in the
spray tank to keep the chemical solution mixed.
Pull the tank-agitation lever rearward to circulate
the content in the spray tank.
Push the lever forward to stop circulating the
content in the spray tank.
14
Figure 12
5. Sprayer wand
6. Sprayer-pressure gauge
8. Wand pressure control
12).
12).
g033348
position
N

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents