YASKAWA PG-B3 Installation Manual page 27

Hide thumbs Also See for PG-B3:
Table of Contents

Advertisement

5.
Wire the motor PG encoder to the terminal block on the option according to
Figure
17.
Refer to
Figure 21
Refer to
Table 9
Figure 17
Loosen the screws and
insert the wire into the
opening on the terminal block.
Wire crimping ferrule terminals
or not soldered ends
Table 4 Parameter Settings and Connections for Different Encoder Types
PG Encoder type
Single-Pulse (A)
Two-Pulse (AB Quadrature)
Two-Pulse with Z Marker
YASKAWA ELECTRIC TOBP C730600 75B YASKAWA AC Drive Option PG-B3 Installation Manual
for the PG-B3 Option and PG Encoder connection diagram.
for a detailed description of the option terminal functions.
Screwdriver blade size
Option terminal block
Figure 17 Connect Cable Wiring
Number of PG
Control Method
Encoders
V/f w/PG
CLV
V/f w/PG
CLV
V/f w/PG
CLV
5 Installation Procedure
Blade depth of
0.4 mm or less
Blade width of
2.5 mm or less
Pull back the shielding and lightly twist the end
with fingers, keeping the ends from fraying.
about 5.5 mm (7/32")
When not using crimped
insulated sleeves
F1-21 Setting
1
2
N/A
1
N/A
2
N/A
1
2
N/A
1
None Required
2
None Required
1
2
N/A
1
None Required
2
None Required
F1-37 Setting
0
N/A
N/A
N/A
1
N/A
None Required
None Required
1
N/A
None Required
None Required
B3
0
1
1
27

Advertisement

Table of Contents
loading

Table of Contents