Complete Battery Replacement; Place Controller Online - Lenovo ThinkSystem DE Series Hardware Installation And Maintenance Manual

For 2u enclosures
Hide thumbs Also See for ThinkSystem DE Series:
Table of Contents

Advertisement

Controller canister
Step 4.
Move the cam handle to the left to lock the controller canister in place.
Step 5.
Reconnect all the cables.
Go to Complete battery replacement.

Complete battery replacement

If you have a two-controller configuration, you place the affected controller online and confirm that all
components are working correctly. Then, you can collect support data and resume operations.

Place controller online

Place the controller online to confirm the storage array is working correctly. Then, you can collect support
data and resume operations.
Perform this task only if your storage array has two controllers.
Step 1.
As the controller boots, check the controller LEDs and the seven-segment display.
Note: The figure shows an example controller canister. Your controller might have a different
number and a different type of host ports.
When communication with the other controller is reestablished:
• The seven-segment display shows the repeating sequence OS, OL, blank to indicate that the
controller is offline.
• The amber Attention LED remains lit.
• The Host Link LEDs might be on, blinking, or off, depending on the host interface.
98
ThinkSystem DE Series Hardware Installation and Maintenance Guide for 2U Enclosures
Cam handle

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

De6000fDe4000fDe120sDe2000hDe240sDe6000h ... Show all

Table of Contents