Lenovo ThinkSystem DE2000H Installation And Setup Instructions

Lenovo ThinkSystem DE2000H Installation And Setup Instructions

Hide thumbs Also See for ThinkSystem DE2000H:

Advertisement

ThinkSystem DE2000H, DE4000H, DE4000F,
DE6000H, DE6000F, DE120S, and DE240S Storage
Systems
Installation and Setup Instructions for 2U Enclosures
Machine Types: DE2000H (7Y70, 7Y71), DE4000H (7Y74, 7Y75),
DE4000F (7Y76), DE6000H (7Y78), DE6000F (7Y79),
DE120S (7Y63), and DE240S (7Y68)

Prepare for installation | Stage 1

Pre-setup
In the box
Shelf with drives installed
You provide
Phillips
flashlight, and ESD strap
HELPFUL LINKS
Lenovo Data Center Support Web site (worldwide):
http://datacentersupport.lenovo.com
Lenovo Data Center Support Web site (China):
http://support.lenovo.com.cn/EsWeb/
Create an account and register your hardware at datacentersupport.lenovo.com
Inventory cables and make note of the quantity.
Confirm that your location provides 100-240V AC power.
and rackmount hardware
2
2 screwdriver,
2U rack
space
Prepare for installation
1
Ethernet cables
if ordered
I/O cables
if ordered
A standard 19 in. (48.30 cm) rack to fit 2U
shelves of the following dimensions:
Shelf: 12-drive
2U
Height: 3.41 in. (8.68 cm)
Width: 17.6 in. (44.7 cm)
Depth: 21.1 in. (53.6 cm)
Max Weight: 63.9 lb (29.0 kg)
First Edition (September 2018)
© Copyright Lenovo 2018.
LIMITED AND RESTRICTED RIGHTS NOTICE: If data or software is delivered pursuant
to a General Services Administration (GSA) contract, use, reproduction, or disclosure
is subject to restrictions set forth in Contract No. GS-35F-05925.
LENOVO, LENOVO logo, and THINKSYSTEM are trademarks of Lenovo.
Microsoft and Windows are trademarks of the Microsoft group of companies.
All other trademarks are the property of their respective owners.
© 2018 Lenovo.
Install hardware
Cable storage
2
SAS cables
included only with
the drive shelves
Power cables
(two for each shelf)
Shelf: 24-drive
Height: 3.34 in. (8.48 cm)
Width: 17.6 in. (44.7 cm)
Depth: 19.0 in. (48.3 cm)
Max Weight: 60.5 lb (27.4 kg)
Complete system setup
and configuration
3
4
A supported browser
for the management
software

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ThinkSystem DE2000H and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Lenovo ThinkSystem DE2000H

  • Page 1 DE4000F (7Y76), DE6000H (7Y78), DE6000F (7Y79), DE120S (7Y63), and DE240S (7Y68) Prepare for installation | Stage 1 Create an account and register your hardware at datacentersupport.lenovo.com Inventory cables and make note of the quantity. Pre-setup Confirm that your location provides 100-240V AC power.
  • Page 2 Install the Rails Refer to the enclosed instructions for detailed information on how to install the rails. To download the instructions, go to Lenovo Data Center Support Web site. NOTE: Install hardware from the bottom of the rack up to the top to prevent the equipment from toppling over.
  • Page 3 Cable storage | Stage 3 Example A: DE6000H or DE6000F controller shelf with three Cable the Shelves DE120S/DE240S drive shelves in a standard SAS configuration. Cable the system according to your configuration. Examples are shown in this section. For more cabling options, see ThinkSystem DE-Series Hardware Installation and Maintenance Guide for 2U Enclosures.
  • Page 4 Controller Shelf. Highlight controller B, and then select Configure management ports to set the IP addresses for management port 1 on controller B. Do not configure management port 2. This port is reserved for Lenovo technical support. After you have configured controller B’s management port, repeat for controller A.

Table of Contents

Save PDF