GE 8 Series Operating Manual page 60

Table of Contents

Advertisement

Example 5:
An equivalent set of parameters for Example 4 is.
Weekday
d1
- Saturday
SEM START
00:00
SEM STOP
23:59
SEM START
SEM STOP
The SEM mode is active from 18:00 of weekday d3 - Monday until 06:00 of weekday d4 - Tuesday (as
indicated by the SEM STOP time of weekday d4 - Tuesday).
The SEM STOP time of weekday d3 - Monday has no effect as it is followed by the SEM STOP time of
weekday d4 - Tuesday.
It can be, without change of meaning, any time between 18:00 and 23:59.
Similarly, the SEM mode is active from 18:00 of weekday d4 - Tuesday until 06:00 of weekday d5 -
Wednesday.
The SEM START time of weekday d5 - Wednesday has no effect as it is preceded by the SEM START time
of weekday d4 - Tuesday.
It can be, without change of meaning, any time between 00:00 and 06:00.
NOTE !
To avoid undesired SEM mode operation, verify:
• Date and Time (first page of parameter).
• SEM mode screen how many hours of SEM mode operation have been selected
for each day of the week.
NOTE !
The SEM mode will become active only if the load is supplied from the inverter.
Modifications reserved
OPM_SPE_XXX_10K_40K_8GB_V020.doc
d2
d3
- Sunday
- Monday
00:00
18:00
20:00
18:00
d4
d5
- Tuesday
- Wednesday
18:00
06:00
06:00
06:00
Operating Manual SitePro 10-15-20-30-40 kVA / S8
d6
d7
- Thursday
- Friday
09:00
12:00
09:00
13:00
Page 60/99

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents