GE 8 Series Operating Manual page 47

Table of Contents

Advertisement

Home\Meter
INVERTER
f
L1
L2
L3
T
SYNCHRONIZED
Home\Meter
SYSTEM LOAD
L1
:
230 V
L2
:
230 V
L3
:
230 V
LOAD ON INVERTER
Home\Meter
SYSTEM LOAD
L1
:
6.2 kW
L2
:
4.9 kW
L3
:
3.7 kW
LOAD ON INVERTER
Home\Meter
COUNTERS
Bypass mains failure
Rectifier mains failure
Overloads
InvOperTime [h]
UPSOperTime [h]
Home\Meter
MAINS
NUMBER OF FAST TRANSIENTS
<2ms
>2ms
25
20
SEM RATE
Modifications reserved
OPM_SPE_XXX_10K_40K_8GB_V020.doc
50 Hz
230 V
230 V
230 V
+25° C
30.0 A
50 %
24.0 A
40 %
18.0 A
30 %
6.9 kVA
50 %
5.5 kVA
40 %
4.1 kVA
30 %
:
53
:
35
:
15
:
2135
:
3125
>5ms
>10ms
7
5
=
70 %
Inverter data screen
f
The output frequency of the Inverter.
L1
L2
3-phase output voltage PHASE/NEUTRAL.
L3
T
The temperature of the inverter bridge.
The synchronization status of the inverter with respect to
mains (SYNCHRONIZED / NOT SYNCHRONIZED).
Load on phases screen 1
... V
Output voltage PHASE/NEUTRAL for each phase.
... A
The output current as RMS values (for RPA: total
value of Parallel System).
... %
The output load as percentage (for RPA: with
respect to the rated power of Parallel System).
The source of the power supplied to the load.
Load on phases screen 2
... kW
The load active power (kW) (for RPA: total value of
Parallel System).
... kVA
The load apparent power (kVA) (for RPA: total
value of Parallel System).
... %
The output Load as percentage (for RPA: with
respect to the rated power of Parallel System).
The source of the power supplied to the load.
Statistics screen
The total number of minor mains faults (bypass mains out
of tolerance faults).
The total number of times a gap of mains in the rectifier has
been reordered.
The total number of detected output overloads.
The total operating time for the Inverter (in hours).
The total operating time for the UPS (in hours).
SEM mode statistic screen (Super Eco Mode)
This screen is enabled only for a single UPS, not for an RPA
Parallel System.
The number of fast transients occurred on the bypass
utility on the last seven days.
The statistic evaluation in % (100= good; 0= bad) of the
utility, for the SEM mode operation.
Page 47/99