GE 8 Series Operating Manual page 40

Table of Contents

Advertisement

JB-1
JA-1
Control bus cables routing
Place and fix the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 inside the UPS cabinets in the
position illustrated in the drawing Fig 5.9.3-4.
NOTE !
Pay attention when cabling and routing the bus cables JA and JB inside the UPS
cabinet.
In case one unit should be removed from the Parallel System, the bus cables JA
and JB must be removed from the cabinet without disconnect them from the
metal plate where are located the sockets JA and JB.
For reliability reasons the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 connecting the units should
be run in separated protected conduits (as indicated in Fig. 5.9.3-4) separated from the power
cables.
It is important that the cable JA must be the same length as cable JB.
WARNING !
Connection and commissioning of an additional UPS to an existing Parallel System,
must be performed by a service engineer from of your Service Centre.
Modifications reserved
OPM_SPE_XXX_10K_40K_8GB_V020.doc
JB-1
JB-2
JB-1
JA-1
Fig. 5.9.3-4 Control Bus cable routing and connection
JA-1
JA-2
JB-2
JA-2
Operating Manual SitePro 10-15-20-30-40 kVA / S8
Page 40/99

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents