Cutting Connecting Rod; Connecting Rod Installation - Allen-Bradley A Series Installation Instructions Manual

Universal disconnect switch
Hide thumbs Also See for A Series:
Table of Contents

Advertisement

Rod Operated Switch Installation (Cont'd)
2

Cutting Connecting Rod

1
Measure working depth of enclosure.
Enclosure
Mounting
Working Depth
Plate
(Inside Flange
of Enclosure to
Mounting Plate)
3

Connecting Rod Installation

1
Verify that disconnect switch and handle are in "OFF" position
(Switch blades will be visible).
2
2
Rotate connecting rod
into drive bar 9-10 full
turns.
2
See steps
3
5
Engage ears of connecting rod into slots of handle link.
6
Install hitch pin
through ears of
connecting rod.
2
Measure, mark and cut connecting rod.
N
Drive Bar
2
and
4
for final rod alignment.
Connecting
Rod
5
Handle Link
ATTENTION:
If not operating properly, go to Rod Operated
Adjustment Procedure.
Publication 1494U-IN007B-EN-P - July 2018
Universal Disconnect Switch Installation Instructions (200A)
7
Install spring to handle link.
Hitch Pin
6
8
Install other side of spring
to handle bracket.
CHECK FOR PROPER OPERATION.
3
Remove burrs.
Align threaded rod
toward handle and,
4
if needed, rotate
counterclockwise
until ears engage the
primary link slots.
3
Ensure that
the handle
is in the full
"OFF" position.
7
8
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1494u-d200

Table of Contents