Figure A-3. Single-Thread Installation - Comtech EF Data XSAT-7080 Series Installation And Operation Manual

5 to 25, 50 & 100 watts
Table of Contents

Advertisement

XSAT7080 X-Band Transceiver
5-25W Installation
A.4.2 S
-T
INGLE
HREAD
Step
Procedures
1
Place unistrut bracket (1, Figure A-1) on a flat surface. (see Figure A-4)
2
Slide springnuts (9) into the channel of the unistrut bracket.
3
Fasten two pipe blocks (11) loosely to the springnuts using two bolts (6), two flat
washers (7), and two split washer (8).
4
Position the unistrut bracket (1) with pipe blocks (11) against the mounting pole,
slide the pipe blocks (11) until they contact the mounting pole. Ensure the pipe
blocks (11) are centered to the unistrut bracket (1). Tighten the hardware.
5
Attach bracket (5, figure A-1) to the strap (4) using two nuts (10), two flat
washers, (7), and two split washers (8).
6
Place the assembly against the pole with the strap around the pole and trim the
strap to fit as shown in Figure A-5, using the tin snips. Attach bracket (3, figure
A-1) to the strap (4) using two nuts (10), two flat washers (7), and two split
washers (8).
7
Slide tensioner bracket (2) into channel of the unistrut bracket (1). Place
assembly on the pole. Slide bracket (3) over bracket (2).
8
Place flat washer (7) and split washer (8), and nut (10) on bracket (2). Tighten nut
to secure the tension strap.
9
Slide two springnuts, (5, figure A-2) into channel of the unistrut bracket
(1, figure A-1).
I
NSTALLATION
A–5
Figure A-3. Single-Thread
Two RF Cables (TX/RX) and a
LNA are required for
installation.
IMPORTANT
Revision 0
MN/XSAT7080.IOM
Installation

Advertisement

Table of Contents
loading

Table of Contents