Removing And Installing The Front Bezel - Extreme Networks ExtremeAnalytics PV-A-305 Installation Manuals

Table of Contents

Advertisement

Table 7: RJ45 Port LEDs (Management Port)
LED Type
Network speed (right)
Link activity (left)
Power Supply Status Indicator Patterns
The engine has two power supplies, supplying hot-pluggable power redundancy. The system distributes
the power load across both power supplies to maximize efficiency.
Each power supply has a single bi-color LED to indicate power supply status, as described in
Table 8: Power Supply Status LED Indicator Patterns
LED Pattern
Green
Off
1Hz blinking green
Amber
1Hz blinking amber
Amber
2Hz blinking green

Removing and Installing the Front Bezel

The PV-A-305 engine comes with an optional front panel bezel that can be attached to the front of the
chassis by snapping the bezel onto the chassis handles. A key lock allows you to lock the bezel in place
so that front panel controls cannot be used. You can still monitor system status indicators with the bezel
in place.
Removing the Front Bezel
To remove the front bezel:
1
Unlock the bezel if it is locked.
2 Remove the left end of the front bezel from rack handle.
ExtremeAnalytics® PV-A-305 Installation Guide for version 8.1
LED Pattern
Off
Amber
Green
Off
Solid Green
Blinking Green
Power Supply Condition
Output on and OK
No AC power to all power supplies
AC present / Only 12VSB on (PS off) or PS in cold redundant state
AC power cord unplugged or AC power lost. With a 2nd PS in parallel still with AC input
power
Power supply warning events where PS continues to operate — high temp, high power,
high current, slow fan
Power supply critical event causing a shutdown, failure, OCP, OVP, fan fail
Power supply firmware updating
Engine Overview and Setup
Status Indication
10 Mbps
100 Mbps
1000 Mbps
No link
Active link
Data traffic activity
Table
8.
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents