Chapter 2: Hardware Installation; Mounting The Appliance; Attaching The Front Bezel - Extreme Networks ExtremeCloud E2120 Installation Manual

Hide thumbs Also See for ExtremeCloud E2120:
Table of Contents

Advertisement

2
Hardware Installation

Mounting the Appliance

Attaching the Front Bezel

Connecting to a Power Source
Installing a Power Supply
Removing a Power Supply
Replacing a Power Supply
To prepare for Hardware Installation of E2120:
1
Match the model number on the purchase order with the model numbers in the packing list and on
the E2120 appliance.
2 Verify the contents of the box include the E2120 and the included hardware matches the
contents.
Table 3: E2120 Product Information
Part Number
30138
Mounting the Appliance
The E2120 appliance can be mounted on rack or a table. Before mounting the appliance in a rack:
1
Read the Rail Kit Installation instructions sheet included with the rack mounting kit.
Note
The rack handles come attached to the unit.
2 Install the rails and mount the appliance in the rack as instructed.
3 If you are table mounting the appliance, ensure at least 6 cm of clearance on all sides of the
appliance for proper ventilation.
Attaching the Front Bezel
The E2120 Appliance comes with an optional front bezel. It can be attached to the front of the chassis
by snapping it on the rack handles. A key lock allows you to lock the bezel in place to restrict access to
the controls on the front panel. You can monitor the system status indicators with the bezel in place.
ExtremeCloud™ Appliance E2120
Description
E2120 Appliance. Expandable management of up to
2,000 managed devices.
package
5

Advertisement

Table of Contents
loading

Table of Contents