Booster Board Calibration - Bio-Logic VMP-300-based Installation And Configuration Manual

Instruments and boosters
Table of Contents

Advertisement

8.2.2 Booster board calibration

16) Select
appropriate amplifier
with the drop-down
box and click on the
"Next"
Hereafter, only the
calibration procedure
of the 4A amplifier is
described
procedure
same for the other
boosters.
17) Connect
cable and the two
DB15
connectors
between
and the calibration
boards as described
below and click on the
"Next" button.
84
the
button.
but
the
is
the
the
cell
amplifier
Manual for VMP300-based instruments

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VMP-300-based and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Sp-200Vsp-300Vmp-300Hcv-3048Sp-240Sp-300

Table of Contents

Save PDF