Boiler - Advantage Controls MegaTronMT Manual

Touch screen controller
Hide thumbs Also See for MegaTronMT:
Table of Contents

Advertisement

B.

Boiler

Standard boiler electrodes have a MNPT stainless steel bushing and are supplied with a FNPT cross
& hold). For a successful installation, it is critical to observe the recommended distances and pipe sizes
provided in the installation drawings.
the electrode is exposed to water and not steam. Properly installed and adjusted, this device will prevent
NOTES:
1.
Install a fully ported type valve between the electrode and the boiler. This
allows the electrode to be isolated for removal and cleaning.
best performance.
WARNINGS:
1.
The probe must be fully immersed in the system water to read correctly.
2.
Do not exceed a maximum water temperature of 436°F (224°C)
3.
Do not exceed a maximum pressure of 350 psi (24.1 bar)
4.
A throttling device must be installed down stream from the elecrode.
Boiler Conductivity Electrodes
Wiring Note: BE-4RTD probes require a 6 conductor cable from controller to probe, BE-32 probes only
require a 2 conductor cable.
BE-4RTD and BE-32
10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MegaTronMT and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents