Cooling Tower; Boiler - Advantage Controls MegaTron Series Technical Manual Installation Maintenance

Table of Contents

Advertisement

Conductivity Probe
TE-4A
Typical Cooling Tower Installation Diagram
B.

Boiler

Standard boiler electrodes (part # BE-4BC) have a 1" MNPT stainless steel bushing and
are supplied with a 1"FNPT cross designed for mounting in the skimmer (surface)
blowdown line. Sampling of the boiler's water can be achieved using one of two typical
plumbing configurations (continuous sampling or timed and/or hold sampling). For a
pH and/or
ORP Probe
8
PE-2 or OE-2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MegaTron Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Mgcpf3e-x2-dhy

Table of Contents