3.1 Preparation

3.1.1 Installation sequence

Table 3-1
lists the overall installation steps. Details are provided in the indicated sections.
Step
Perform mechanical installation of transmitter and probe.
1
2
Connect transmitter wiring and power.
After Installation check the transmitter's configuration and tune if necessary. Transmitters
that were ordered using Honeywell's SmartLine Application and Validation Tool (AVT) will
come with parameters pre-loaded so that the transmitter will give accurate level
measurements out-of-the-box. Refer to SLG 700 HART Option Manual, #34-SL-25-06 or the
SLG 700 FOUNDATION Fieldbus manual, #34-SL-25-07.
Page 28

3 Transmitter Installation

Table 3-1: Installation sequence

Action
SLG 700 SmartLine Level Transmitter User's Manual
See
Section
3.2
3.3
Revision 7