Check for correct operation of the system by carrying out the procedures described in
Chapter 4.

3.2.4 Certified Junction Box Configuration

The following information specifies the Certified Junction Box configuration options.
Controller Area Network (CAN )Termination Link - J1
Terminated
Unterminated (default)
Note: Leave the link in the Unterminated position.

3.3 lOnWORKS cOmmUnicATiOnS BOARd

The LonWorks Communications Board can be installed in the Transmitter Unit by a single person.
It is fitted into the top of the unit to form part of theMain PCB assembly.
Note: Do not install a communications board into a UL or CSA certified Transmitter Unit.
Refer to the General Installation Guidelines at the beginning of this chapter.
Fitting the board should be carried out by a qualified technician.
Electrical interconnections for the communications board are made at the same time as mechanical
installation by means of plugs attached to the communications board. These plugs mate with existing
sockets on the main PCB fitted to the Apex Transmitter Unit lid.
Once the board is fitted any external LonWorks network wiring required is connected.
Plug
(2 off)
Mounting pillar (4 off)
3. inSTAllATiOn
38
LonWorks board
Earth lead