Verifying The End-To-End Path - Paradyne FrameSaver SLV 9x24 Series Installation Instructions Manual

1-slot unit
Table of Contents

Advertisement

Verifying the End-to-End Path

After installation of a remote site unit, run an IP Ping test to ping the NMS at the central
site and verify that the entire path from the remote unit to the NMS is functioning. To run
the IP Ping test, NMS trap managers must have been configured for the remote unit.
One of those trap managers must be the central site NMS.
If trap managers were not configured, proceed to Troubleshooting the Network
Connection on page 17 and run a Connectivity test.
1. Select the IP Ping test.
Main Menu
Test
2. Enter the IP Address of the device being pinged, then select Start.
NOTE:
When running tests, the cursor is positioned over the Start command. Press
Enter to start the test. Stop is displayed while the test is running. Press Enter
again to issue the Stop command.
– While the test is running, In Progress . . . is displayed in the Status field.
– When the test is finished, Alive. Latency = nn ms should appear as the Status
( nn being the amount of time the test took in milliseconds).
If any other message is displayed, additional testing will be required. See Device
Messages in Chapter 11, Displaying System Information , for information about IP
Ping-related messages.
If setting up a FrameSaver 9124, proceed to Connecting to the DSX (9124 Only)
on page 18. If setting up a FrameSaver 9624, proceed to Connecting to the DTE
on page 19.
IP Ping
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Framesaver slv 9124Framesaver slv 9624

Table of Contents