Firebox Panel Removal / Installation; Removal - Pacific energy MIRAGE 18 Installation And Operating Instructions Manual

A balanced flue free standing gas heater
Table of Contents

Advertisement

Note: The burner tray needs to
be removed before installation or
removal of panels - See "Burner
Kit/Media Installation/Removal" on
page 25.

Removal

1. After removing the burner
tray, remove one of the side
panel clips (Figure 22). Then
allow the top portion of the
side panel to move away from
the rebox wall (Figure 22).
When you have enough room,
remove the panel from the
stove.
2. Repeat step 1 to remove
second side panel.
Note: With both side panels
removed, there is nothing
holding the upper back panel
in place and so you must be
ready to support and remove
it at the same time as the side
panel.
3. Remove the upper back panel
by allowing it to tilt forward.
Remove (Figure 24).
4. Remove the lower back panel
by lifting it off of the pilot ledge
and pull it out of stove
(Figure 25).
Installation
1. Insert lower back panel so that
it is sitting on the ledge at the
back of the rebox (Figure 25).
2. Insert upper back panel so
that it is sitting on top of the
lower back panel as shown in
(Figure 24). The panel must be
supported until one of the side
panels is mounted in place.
Note: There are two tabs in
the bottom of the upper back
100000432-50

Firebox Panel Removal / Installation

Left side
panel
Figure 21: Interior panel set.
Figure 23: Right side panel.
panel that t into two slots
on the top of the lower back
panel.
3. Insert rst side panel by tilt-
ing the panel into the rebox
chamber. Then slide the panel
until it reaches the rebox side
wall. Secure panel by attach-
ing the side panel clip.
4. Repeat step 3 for the second
side panel.
5. Reinstall burner kit.
Upper back
panel
Right side
panel
Lower back
panel
24
Figure 22: Side panel clip in place.
Figure 24: Upper back panel.
Figure 25: Lower back panel.
060718-44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents