Installing The Mirage 18; Installation Checklist - Pacific energy MIRAGE 18 Installation And Operating Instructions Manual

A balanced flue free standing gas heater
Table of Contents

Advertisement

Installation Checklist

1. Uncrate the Mirage 18. Examine for shipping damage and that the shipping list is complete.
2. Review the following:
• Mirage 18 dimensions (page 16).
• Locating the Stove (page 17).
• Clearances to combustibles (page 18).
• FlueTerminal Minimum Clearances (page 19).
• Co-axial ueing chart (page 20).
3. Install ueing.
4. Make gas and electrical connections (page 21).
5. Gas pressure check.
6. Gas pressure testing procedure (page 23).
7. Firebox panel set installation .
8. Glass or log set installation (page 26).
9. Door installation (page 28).
10. Install backup batteries and link the hand transmitter to the Mirage 18 (page 29).
11. Adjustments (page 30)
12. Final check.
Before leaving this unit with the customer, the installer must ensure that the appliance is ring
correctly and operation fully explained to the customer.
This includes:
Adjusting ue damper if ame is too hectic.
If required, adjusting the primary air to ensure that the ame does not carbon. First allow the unit
to burn for 15 - 20 minutes to stabilize.
Caution: Any alteration to the product that causes sooting or carboning that results in damage is not
the responsibility of the manufacturer.
060718-44

Installing the Mirage 18

15
100000432-50

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents