Pacific energy MIRAGE 18 Installation And Operating Instructions Manual page 38

A balanced flue free standing gas heater
Table of Contents

Advertisement

4. Remove the pilot assembly by guiding the pilot wires and pilot gas line out through the opening between
the gas valve and the control module, and the opening which the pilot head sits. Take note of how the
pilot gas line is routed through the control panel as the new pilot assembly gas line will have to be routed
the same way. See Figure 7060.
5. Before reassembling the components, examine the gaskets that are attached to the control panel (Figure
69) and replace if necesarry.
6. Reassemble all components.
NOTE: Extreme care must be taken when routing the new gas line into place so that the gas line does not
become crimped or twisted.
Figure 68: Square slot for insertion and removal of
pilot assy.
Figure 70: Gas line routing.
100000432-50
Figure 69: Pilot assembly removed showing gaskets.
Figure 71: Control panel top view.
38
Guide wires and gas line
through channel
060718-44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents