Commissioning; Scope Of Delivery; Power Supply; Initial Commissioning - wtw Oxi 3310 IDS Operating Manual

Digital meter for digital ids-d.o. sensors
Table of Contents

Advertisement

Commissioning

12
3
Commissioning
3.1

Scope of delivery

 Meter Oxi 3310 IDS (Oxi 3315)
 4 batteries 1.5 V Mignon type AA
 USB cable (A plug on mini B plug)
 Short instructions
 CD-ROM with
– USB drivers
– detailed operating manual
– Software MultiLab Importer
3.2

Power supply

The Oxi 3310 IDS (Oxi 3315) is supplied with power in the following ways:
 Battery operation (4 batteries, 1.5 V Mignon type AA)
 USB operation via a connected USB-B cable
3.3

Initial commissioning

Perform the following activities:
 Insert the supplied batteries
 Switch on the meter (see
section 4.2 S
WITCHING ON THE METER
 Set the date and time (see
section 4.4.5 E
XAMPLE
22)
, page 17)
2
: S
ON NAVIGATION
ETTING THE DATE AND TIME
Oxi 3310 IDS (Oxi 3315)
, page
ba75944e02
10/2014

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oxi 3315

Table of Contents