Section H - Installation

This section explains how to mount the ESP-LXME controller, connect
the wiring, and verify proper operation.

Prepare For Installation

Installation Checklist

When installing the ESP-LXME controller for the first time, it is
1
1
recommended that you complete the following steps in order.
1
1
For your convenience a check-off box is provided for each step.
1
1
Check box contents ........................................................................Page 93
1
1
Gather installation tools ...............................................................Page 94
1
1
Select a location ..............................................................................Page 95
1
1
Mount the controller .....................................................................Page 98
1
1
Connect source power ..................................................................Page 99
1
1
Install base and station module(s) ............................................Page 102
Connect field wiring.......................................................................Page 105
Complete the installation ............................................................Page 108

Check Box Contents

All components below are included with your ESP-LXME controller and
are required for installation. If anything is missing, please contact your
distributor before proceeding.
A
ESP-LXME controller and modules.
B
Mounting hardware (5 screws, 5 plastic wall anchors).
C
Controller cabinet keys.
D
ESP-LXME Controller Installation, Programming, & Operation
Guide.
E
ESP-LXME Controller Programming Chart.
F
Controller mounting template.
G
Station Numbering Labels
1
7
Box Contents
2
3
456
ESP-LXME Controller
93