Installing The Blackdiamond Cable Manager - Extreme Networks BlackDiamond 10K Series Installation Manual

Table of Contents

Advertisement

BlackDiamond 10808 Switch Chassis
To ground the chassis:
1 Strip 0.5 inch (1.2 cm) of insulation from the 14 AWG, high strand-count copper wire cable.
2 Insert the cable into the cable lug.
CAUTION
Ensure that no copper is visible between the lug and the cable insulation.
3 Tighten the cable retention screw, using a
4 Attach the ground lug, lock washers, and nuts (in that order) to the grounding studs on the rear of
the chassis. Tighten the nuts to 125 in-lbs of torque.

Installing the BlackDiamond Cable Manager

You need the following tools and equipment to install the cable manager:
• #2 Phillips-head screwdriver
• Cable manager
The BlackDiamond 10808 cable manager comes assembled in three parts; a cover plate, the cable guides,
and the mounting base, as shown in Figure 21.
52
1
/
" or
5
/
" flathead screwdriver, to 20 in-lbs of torque.
4
16
Extreme Networks BlackDiamond 10K-Series Switch Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blackdiamond 10808

Table of Contents