Preparing the installation site

Cabling infrastructure

Ensure that the proper cabling is installed at the site. Refer to
or visit

Installation location

Before installing the device, plan its location and orientation relative to other devices and
equipment. Allow at least 7.62cm (3 inches) of space at the front of the device for the twisted-pair,
fiber-optic, and power cabling. Also, allow a minimum of 3 in. of space between the sides and the
back of the device and walls or other obstructions.

Installing a redundant power supply

FGS and FGS-STK devices ship with one AC or DC power supply installed. You can install a second
supply for added power or redundancy.
FIGURE 17
If you plan to install a second power supply, it may be easier to install it before mounting the device,
although the power supplies are "hot swappable" and can be installed or removed after the device
is mounted and powered on.
CAUTION
Always disconnect the power supply from the power source (outlet) before you install it in or
remove it from the device. Otherwise, the power supply or the device could be damaged. The
device can be running while a power supply is being installed or removed, but the power supply
itself should be disconnected from the power source.
Brocade FastIron GS and FastIron GS-STK Hardware Installation Guide
53-1001783-01
DRAFT: BROCADE CONFIDENTIAL
www.brocade.com
for a summary of supported cabling types and their specifications.
AC Power Supply Front Panel
Preparing the installation site
"Device specifications"
Figure 17
shows the front panel of an AC power supply.
2
on page 69
23