Download Print this page

Assembly Instructions - progressive automations flt-02 User Manual

Hide thumbs Also See for flt-02:

Advertisement

Assembly Instructions

STEP 1
Before you start make sure to lay out all the
components and hardware to ensure you have all the
necessary parts listed on the parts page. Separate the
Frame Ends
(3a,3b) and you will find the Center Rails (4) inside.
STEP 2
Place one of the Legs (1) into the Frame End-CB (3a)
making sure that the bar is on the top side in relation to the
(Leg 1) Then line up the holes on each Leg (1) with the
holes on the Frame End-CB (3a)
Insert four M6x14 Machine Screws (11) through the
holes on the Frame End-CB (3a) going into the Leg (1).
Rotate each screw with the supplied Allen Wrench just a
few turns, then once all four are inserted you can tighten
them until secure. Do this for both Legs.
STEP 3
Take a Side Bracket (5a or 5b) and slide it into the
Frame End-CB (3a). Insert two of the M6x35 Machine
Screws (12) through the two holes in the top of the
Side Bracket. Use the supplied Allen Wrench to rotate
each screw a few turns. Once both the screws are
inserted, tighten until secure. Repeat this process for
both legs.
STEP 4
Slide the two Center Rails (4) into the two Frame Ends
(3a,3b). Make sure the slots in the Center Rails are
facing inward and that they are closer to the top edge
when the assembled unit is upside down (see picture
below).
STEP 5
Attach a Foot (2) with four M6x14 Machine Screws (11)
and tighten until secure in a cross-pattern. Repeat this
process for both legs.
5

Hide quick links:

Advertisement

loading