Download Print this page

progressive automations flt-02 User Manual page 7

Hide thumbs Also See for flt-02:

Advertisement

Assembly Instructions
STEP 9
Connect the cable from the Leg (1) that is attached to the
Frame End-CB (3a) directly into the Control Box (6). Then
Slide the Control Box (6) into the Frame End-CB (3a).
Connect the Cable (9) to the other Leg (1) and the
Control Box (6). Then Connect the Hand Remote (7)
cable to the Control Box (6).
Use the adhesive-backed Cable Clips (15) to secure the
cables so they are not loose and in the way.
STEP 10
We recommend having two people for this step. Grab the
fully assembled desk by the legs (not by the desktop) and
turn the desk right-side up. Adjust the pre-installed glides
on the Feet (2) as needed.
STEP 11
Plug the Power Cord (8) into a 110V outlet.
IMPORTANT
You must reset the desk prior to use:
To reset you must press and hold the DOWN button on
the Hand Remote (7) until the table lift reaches its lowest
point. Release the DOWN button. Press and hold the
DOWN button again until the LED display shows "RST". If
you are not using an LED hand remote hold the DOWN
button for 10 seconds. Release the DOWN button. Finally
press and hold the DOWN button once more until the
desk lowers, slightly rises then stops. Release the DOWN
button and your desk is now ready to use.
To program up to four presets with the remote just use the
Up/Down buttons to find your desired height, then press
the "M" button followed by a number 1-4.
Once a preset button is pressed, the desk will move to the
programmed height. Make sure no obstacles are in the
desk's path or in contact with any walls.
7

Hide quick links:

Advertisement

loading