Fig 3-20 : Turn The Handle Counterclockwise; Fig 3-21 : Align The Adapter - Hach HIAC 9705 Operator's Manual

Liquid particle counter
Table of Contents

Advertisement

38 of 82
6) Prepare the large volume adapter by turning the handle fully counterclockwise. This
7) With the O-ring opened, align the adapter as shown in
Operator Manual
opens the internal O-ring.
hold this piece still

Fig 3-20 : Turn the Handle Counterclockwise

on the bottom aligns with the threaded hole in the bottle dock. Position the hole in the
bottom of the adapter directly over the short needle.

Fig 3-21 : Align the Adapter

System Setup - 9705
Figure
3-21, such that the peg
HIAC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents