Service and Parts Manual
PVG 16/32/128/256
Installation
18 |
©
Danfoss | October 2018
PVG 16 with PVE series 6 installation
PVE series 6 exploded view
5 [0.2]
8 ± 0.5 Nm
[70 ± 4.4 lbf in]
When installing, protect the LVDT pin (if present), ensure O-rings are in place and be sure to not over-
torque.
5 [0.2]
8 ± 0.5 Nm
[70 ± 4.4 lbf in]
AX284661889190en-000101