Fitting Metric Screw Joints To The Fronius String Control 250/30 Dcd Df; General; Recommended Order In Which To Insert The Metric Screw Joints - Fronius 250/30 DCD DF Operating Instructions Manual

String control
Table of Contents

Advertisement

Available languages

Available languages

Fitting metric screw joints to the Fronius String Con-
trol 250/30 DCD DF

General

-
-
-
Recommended
order in which to
insert the metric
screw joints
*
Fitting metric
1
screw joints to
the Fronius String
Control 250/30
DCD DF
(1)
(2)
(3)
Use the right number of metric screw joints for the available solar module strings. Fit
sealing glands into empty screw joints.
Insert the metric screw joints in the following order:
from bottom to top and from left to right.
Tighten the metric screw joints and blank screw joints with the tightening torque spec-
ified for their size.
M32
15
11
5
8
13
10
4
7
12
9
6
M20*
As an outlet for the grounding cable only if optional overvoltage protection is used
Lock nut
Screw joint
Strain-relief device
3
1
2
M25
M40
M40
2
M32
16
22
25
19
15
21
24
18
20
23
17
17
17
M20
61

Advertisement

Table of Contents
loading

Table of Contents