Installing Metric Screw Joints On The Fronius String Control 100/12; General; Recommended Sequence For Inserting The Metric Screw Joints - Fronius String Control 100/12 Operating Instructions Manual

System monitoring
Table of Contents

Advertisement

Available languages

Available languages

Installing Metric Screw Joints on the Fronius String
Control 100/12

General

-
-
-
Recommended
Sequence for In-
serting the Metric
Screw Joints
*
Installing Metric
1
Screw Joints on
the Fronius String
Control 100/12
64
Insert metric screw joints corresponding to the number of available solar module
strings, insert threaded plugs in the empty positions.
Observe the sequence when inserting metric screw joints:
from bottom to top and from left to right.
Use the specified tightening torque corresponding to their size for the metric screw
joints and threaded plugs.
M16
3
3
6
6
9
9
8
8
M20 *
2
2
5
5
M16
M
6
1
1
M16
4
4
7
7
only when using optional overvoltage protection as outlet for the ground cable
1
(1)
2
(2)
3
(3)
M16
11
1
12
14
1
15
M16
10
10
13
13
M32
M3
M32
M3
(1)
(2)
(3)
22
25
17
17
19
19
16
16
18
18
21
24
20
20
23
26
Counter nut
Screw joint
Strain-relief device
28
M25
M16
27

Advertisement

Table of Contents
loading

Table of Contents