Fronius Smart Meter TS 65A-3
EN
Operating Instructions
42,0426,0349,EN
013-25052022

Advertisement

Table of Contents
loading

Summary of Contents for Fronius TS 65A-3

  • Page 1 Operating Instructions Fronius Smart Meter TS 65A-3 Operating Instructions 42,0426,0349,EN 013-25052022...
  • Page 3: Table Of Contents

    Setting the address on the Fronius Smart Meter TS Start-up Fronius SnapINverter General Connecting to the Fronius Datamanager Configuring the Fronius Smart Meter TS as the primary meter Configuring the Fronius Smart Meter TS as a secondary meter Fronius GEN24 inverter General Installation using the web browser...
  • Page 5: Safety Rules

    Safety rules...
  • Page 7: Safety Rules

    Safety rules Explanation of DANGER! safety notices Indicates immediate danger. ▶ If not avoided, death or serious injury will result. WARNING! Indicates a potentially hazardous situation. ▶ If not avoided, death or serious injury may result. CAUTION! Indicates a situation where damage or injury could occur. ▶...
  • Page 8: Environmental Conditions

    Any safety devices that are not fully functional must be repaired by an author- ised specialist before the device is switched on. Never bypass or disable protection devices. For the location of the safety and danger notices on the device, refer to the sec- tion headed "General remarks"...
  • Page 9: General Information

    General information...
  • Page 11: Fronius Smart Meter

    Fronius Smart Meter TS 65A-3 Device descrip- The Fronius Smart Meter TS is a bidirectional electricity meter which optimises tion self-consumption and records the household's load curve. In conjunction with the Fronius inverter, Fronius Datamanager and Fronius data interface, the Froni- us Smart Meter TS provides a clear overview of a user's own power consumption.
  • Page 12: Information On The Device

    Dangerous electrical voltage. Intended use The Fronius Smart Meter TS is a fixed piece of equipment for public grids of TN/TT systems and records self-consumption and/or individual loads in the sys- tem. The Fronius Smart Meter TS is required for systems with a battery storage...
  • Page 13: Scope Of Supply

    Scope of supply 2x protective cover Fronius Smart Meter TS 65A-3 2x seal wire 2x connection cover Quick Start guide Positioning The Fronius Smart Meter TS can be installed in the following positions in the sys- tem: Positioning at the feed-in point:...
  • Page 14 Positioning at consumption point: For use as a secondary meter to measure individual loads and producers, see chapter Multi-meter system - Fronius SnapINverter on page 24.
  • Page 15: Installation

    Installation...
  • Page 17: Installation

    The update can be started via the in- verter web page or using Solar.web. If several Fronius Smart Meter TS are installed in the system, set the address (see "Setting the address" under "Setting the address on the Fronius Smart...
  • Page 18: Cabling

    The Fronius Smart Meter TS consumes 10 - 30 mA, the nominal capacity of the disconnecting devices and the overcurrent‑protection is determined by the wire thickness, the mains voltage and the required breaking capacity. Disconnecting devices must be mounted within sight and as close as possible to the Fronius Smart Meter TS;...
  • Page 19: Fitting The Protective Cover For The Terminals

    Connecting the Connect the data communication connections of the Fronius Smart Meter TS to data communic- the Modbus interface of the Fronius inverter using a network cable (type CAT5 ation cable to or higher). the inverter...
  • Page 20: Terminating Resistors - Explanation Of Symbols

    Two wires can be installed in each terminal; the wires are twisted first, inser- ted into the terminal and tightened. Note: A loose wire can disable an entire area of the network. The data communication connections of the Fronius Smart Meter TS are electrically isolated from hazardous voltages. Terminating res-...
  • Page 21: Connecting The Terminating Resistor

    Connecting the The terminating resistor is integrated terminating res- in the Fronius Smart Meter TS and is istor manufactured with a bridge between the M and T connections (T = termina- tion). Terminating res- Due to interference, it is recommended that terminating resistors are used as il- istors lustrated below to ensure proper functioning.
  • Page 22: Mounting The Connection Cover

    * The terminating resistor is integrated in the Fronius Smart Meter TS and is manufactured with a bridge between the M and T connections (T = termination). Mounting the Insert the connection covers into the connection cover guides and press firmly.
  • Page 23: Multi-Meter System - Explanation Of Symbols

    Primary meter Records the system's load curve and provides measurement data for energy profiling in Fronius Solar.web. The primary meter also controls the dynamic feed-in control. Secondary meter Records the load curve of individual loads (e.g. washing machine, lamps, TV, heat pump, etc.) in the consumption branch and...
  • Page 24: Modbus Participants - Fronius Snapinverter

    Primary Secondary Ohmpilot meter meter Multi-meter sys- If several Fronius Smart Meter TS are installed, a separate address must be set tem - Fronius Setting the address on the Fronius Smart Meter TS on page 31). for each (see SnapINverter The primary meter is always assigned address 1.
  • Page 25: Modbus Participants - Fronius Gen24

    Terminating resistors must be positioned individually for each channel. Modbus parti- The inputs M0 and M1 can be selected for this purpose. A maximum of 4 Modbus cipants - Fronius participants can be connected to the Modbus terminal on inputs M0 and M1. GEN24...
  • Page 26: Multi-Meter System - Fronius Gen24 Inverter

    Secondary Ohmpilot meter meter Multi-meter sys- If several Fronius Smart Meter TS are installed, a separate address must be set tem - Fronius for each (see Setting the address on the Fronius Smart Meter TS on page 31). GEN24 inverter The primary meter is always assigned address 1.
  • Page 27: Menu - Measured Variables

    Location of the primary meter at the feed-in point. *Terminating resistor R 120 Ohm The following must be observed in a multi-meter system: Connect the primary meter and the battery to different channels (recom- mended). The remaining Modbus participants must be distributed equally. Only assign each Modbus address once.
  • Page 28 Image Scree Description Total active energy drawn* Power factor (L = inductive, C = capacit- ive) Total active energy drawn* Frequency Total active energy drawn* Total reactive power Total reactive energy supplied** Total reactive power Total active energy drawn** Total apparent power Total active energy drawn* Maximum demanded power (P = Peak de- mand) that has been reached since the...
  • Page 29 Image Scree Description Not used Active energy drawn* Apparent power Reactive energy drawn Power factor (L = inductive, C = capacit- ive) Phase voltage Conductor voltage Current...
  • Page 30: Configuration Menu - Structure And Parameters

    Image Scree Description Effective power Displayed when easy connection mode is activated (measurement = A). This value indicates the total energy without considering the direction. Factory setting - displayed when drawn and delivered energy are meas- ured separately (measurement = b). Configuration Screen Code...
  • Page 31: Setting The Address On The Fronius Smart Meter Ts

    Settings that need to be configured. Setting the ad- Symbol Name Event Function dress on the Scroll one screen forward, increase the Fronius Smart value by 1 Meter TS Down Scroll one screen back, decrease the value by 1 Enter Call up settings, confirm value 2 seconds Press and hold "Enter"...
  • Page 33: Start-Up

    Start-up...
  • Page 35: Fronius Snapinverter

    The service password must be entered in order to access the "Meter" menu item. Three-phase or single-phase Fronius Smart Meter TS can be used. In both cases, the selection is made under the "Fronius Smart Meter" item. The Fronius Datamanager automatically identifies the meter type.
  • Page 36: Configuring The Fronius Smart Meter Ts As A Secondary Meter

    Click the button to save the settings. The Fronius Smart Meter TS is configured as a primary meter. The "Current general view" menu area displays the power of the PV modules, self-consumption, the energy fed into the grid and the battery charge (if avail- able).
  • Page 37: Fronius Gen24 Inverter

    The service password must be entered in order to access the "Device configura- tion" menu item. Three-phase or single-phase Fronius Smart Meter TS can be used. In both cases, the selection is made under the "Components" menu area. The meter type is de- termined automatically.
  • Page 38: Configuring The Fronius Smart Meter Ts As The Primary Meter

    Access the "Components“ menu area. Click the "Add component" button. In the "Position" drop-down list, set the position of the meter (feed-in point or consumption point). For more information on the position of the Fronius Smart Meter TS, see Positioning on page 13.
  • Page 39 The Fronius Smart Meter TS is configured as a secondary meter.
  • Page 40: Technical Data

    Technical data Technical data Modbus transmission speed: 9600 baud Parity bit:none Software version: Fronius Datamanager 2.0 (from version 3.16.1 onwards) Fronius Symo Hybrid (from version 1.16.1 onwards) Measuring input Nominal voltage 208 - 400 V Operating range 166.4 - 480 V Power consumption in the voltage ≤...
  • Page 41: Fronius Manufacturer's Warranty

    0.05 mm² Recommended torque max. 0.4 Nm Fronius manu- Detailed, country-specific warranty terms are available on the internet: facturer's war- www.fronius.com/solar/warranty ranty To obtain the full warranty period for your newly installed Fronius inverter or storage system, please register at: www.solarweb.com.